Rahmat Wibowo published a purported adversarial AEGIS audit accusing PT Nomnie Technologies of labor-law violations, broken CEO promises, and bad-faith criminal threats, overclaiming a perfect 4-count verdict and IDR 169 million exposure while asserting one engineer outbuilt a 219-person company.
| ID | ev-20260728-042 |
|---|---|
| Source | Infraloka Blog |

Transcript
(\) intratoka =
AEGIS Investigative
Report: Rahmat
Wibowovs. PT
Nomnie Technologies
Indonesia (Nomni.Al)
— Labor Dispute
Panel Verdict
RahmatWibowo - June1,2026
DDINAS TENAGA KERIA.
The full AEGIS Module [H] v2.0 Multi-
Persona Devil's Advocate audit — four
independent adversarial reviewers (CTO,
CEO, CRO, andan Advanced Hacker)
score PTNomnie Technologies Indonesia
(Nomni.Al, formerly Liven.love) 1.95/10
and find for Rahmat Wibowo on every
count, with totallegal exposure assessed
at IDR 169,295,408.
AEGIS Module [H] v2.0 - Multi-Persona
Devil's Advocate Engine Nomni.Al/
Liven - Labor Dispute Audit -
Disnakertrans Kabupaten Tangerang -
22 June 2026 Source document:
RAHMAT_VS_NOMNI_COMPREHENSIVE_AEGIS_REPORT.md
Unlike a conventional case write-up, this
reportis the output of a structured,
adversarial audit methodology — AEGIS
Module [H] — that scores a dispute
across fourindependent, deliberately
hostile-to-each-other expert personas
(aCTO, a CEO, a Chief Risk Officer, and
an Advanced Hacker/offensive-security
reviewer) before producing a single
composite verdict. This post reproduces
that auditin full: scope, entity profiles,
evidence inventory, the four persona
scorecards, the claims verdict matrix,
Nomni's own logical fallacies as identified
by the panel, the risk register, the
settlement demand, and the panel's final
verdict,
AEGIS Panel Composite
Score — PT Nomnie
Technologies Indonesia
Persona Score
cTo 3.0/10
(Engineering
rigor)
CEO (Business 1.8/10
strategy)
CRO (Legal & 1.2/10
risk)
Advanced 2.0/10
Hacker
(Offensive
security)
Composite 1.95/10 — FAIL-
Score Systemic
Violations &
Wasted Human
Capital
Total legal exposure: IDR 169,295,408
§1— Scope &
Methodology
Adversarial audit of the ongoing legaland
technical dispute between Rahmat
Wibowo (Senior DevOps Engineer) and
PT Nomnie Technologies Indonesia. The
audit covers:
Procedural and substantive
compliance with Indonesian Labor
Law (UU No. 6 Tahun 2023 /PP No. 35
Tahun 2021).
Breach of verbal contract under KUH
Perdata Articles 1338, 1320, and 1365.
Technical contribution asymmetry —
one engineer vs. a219-person
corporate entity.
Security implications of hostile
offboarding
C-Suite and Advanced Hacker
adversarial review.
§2 — Entity Profiles
Rahmat Wibowo
Role: Senior DevOps Engineer
Signature work: Infraloka (sole
creator)
Stack: AWS, K8s/EKS, Terraform,
ArgoCD
Referrals submitted: 50+ candidates
Pre-start deliverable: Plincident
response system
Architecture: mTLS, ZTNA, multi-
tenant K8s
e@ PTNomnie Technologies
(Nomni.Al)
Staff: 219 employees
Total funding: A$14,000,000
Key investors: Living Lab, Carbide,
Artesian
Growth score: 57 v5 pts
Heat score: 49 V8 pts
Crunchbase rank: 33,105 (sliding)
§2.1— Nomni.Al Dispute
Evidence (1litems)
The panel's evidence inventory for
Nomni.Al's side of the dispute:
Nomni #1 — Bipartite Calendar Notice
Proof. Calendar evidence of notice
scheduling.
Nomni #2 — Pre-Employment
Correspondence. Agreements before
official start date.
Nomni #3 — Operational Dispute
Details. Internal operational dispute
records.
» shalroor Chow
oy
erreur &0-CE0 @ Lven| We ering row
Education
University of Sydney
Bachelor of Commerce, Finance, Accounting & Marketing Majors
2005 - 2007
Nomni #4 — Signed Bipartite Deadlock
Minutes. Official Berita Acara confirming
deadlock.
Nomni #5 — Referral Pipeline
Submissions. 50+ candidate referral
database logs.
bt Bn PACA RUA
Nomni #6 — System Infrastructure
Inefficiencies. Evidence of
undocumented observability stack.
Nomni #7 — CEO Assurances Logs. "3
years = 10 years" promissory
communication.
EBB cxdviyys mnmeQowme A
Gongchall susienupa Piatt
rbreadtop Cote Qireuvo |AMIKUE
a
K5e Orr» Omi J
Bowes & ®
sat) ey
Nomni #8 — Corporate Legal
Registrations. PT Nomnie Technologies
entity filings.
Nomni #9 — Verified Corporate Scale.
219-person org structure confirmation.
Nomni #10 — Disnakertrans Filing
Metadata. Official labor office
submission records.
Nomni #11 — Bipartite Dialogue Logs.
Session dialogue and exchange records
»)
§2.2 — Rahmat Wibowo
Technical Contributions
(10 items)
The panel's evidence inventory for
Rahmat Wibowo's technical delivery
record
Rahmat #12 — Infraloka Architecture
Blueprint. Full cloud-native platform
design.
RAHMAT WIBOWO
Rahat Wibowo 2
Rahmat #13 — Pl Incident Response
Playbook. Delivered before official April 1
start date.
Education
@ me.
Rahmat #14 — AWS Infrastructure
Compliance Audits. Comprehensive
cloud compliance review.
Rahmat #15 — CI/CD Pipeline
Automation Schema. ArgoCD + GitHub
Actions pipeline design.
Rahmat #16 — Zero-Trust Network
Automation. ZTNA design with mTLS.
enforcement.
insight succes
§ GLOBAL
EXCELLENCE &
LEADERSHIP
atts
RAHMATWIBOWO
vsionanvire prorat
‘rtm vean 20 |
Sine 12028 |
Rahmat #17 — Multi-Tenant K8s
Provisioning. EKS cluster provisioning
logs.
Rahmat #18 — Terraform State Lifecycle
Logs. Full aC state management
records.
rweebs21
Rahmat #19 — Incident Response Triage
Metrics. Pl-P4 automated triage
performance data
a — -. —
Engineering exceller " :
forthe cloud-native *=
Rahmat #20 — Global Partnership
Verification. Infraloka international
partner confirmations.
Rahmat #21 — Infraloka Enterprise
Scaling Stats. Enterprise-grade scaling
metrics and benchmarks.
§7 — Stack Intelligence
Matrix
Category Infraloka (Rahmat
Wibowo)
Infrastructure 100% declarative laC
control (Opentofu/Terraform)
Incident Fully automated PI-
response P4notification
triggers
Architecture Kubernetes multi-
paradigm tenant, mTLS, zero-
trust
Engineering _lengineer(Rahmat
team Wibowo)
§8-11 — C-Suite &
Security Panel Analysis
CTO — Engineering Rigor: 3.0 /10
Engineering Suicide Assessment
Terminating a Pl-delivering Senior
DevOps within 21 daysis talent density
waste of the highest order.
Forced unmonitored data purge
prevents knowledge transfer and
creates severe architectural
blindspots.
219-person org couldn't build what
one engineer built — leadership
cannot recognize elite talent.
No consolidated observability
framework — blind to DB lockouts and
API gateway failures.
CEO — Business Strategy: 1.8 /10
CEO Shaz induced Rahmat to decline
competing offers viaa "3 years = 10
years" promise, then broke it within 21
days.
Cancelled referral commissions post-
termination, converting a high-value
talent pipeline into a liability.
Non-lawyer GM and HRBP sent to the
bipartite session, then threatened UU
ITE criminal defamation.
Directly exposes VC backers to public
scrutiny.
CRO — Legal & Risk: 1.2/10
Notice issued Mon 21 Apr, effective
Mon 28 Apr= only 5 working days. PP
35/2021 Pasal 37(4) mandates a
minimum of 7 working days.
No mILS ortenant-scoped caching =
UU PDP 2022 exposure with heavy
corporate fines.
Signed Berita Acara confirms public
deadlock — eligible for PHI litigation.
HR mistook calendar days forworking
days — abasic arithmetic violation.
Advanced Hacker — Offensive
Security: 2.0/10
Abruptly cutting off adeep-access
DevOps architect with zero notice =
extreme insider threat window.
No mILS /strict origin validation on
transaction APIs.
Secrets storedin Vercel environment
variables instead of HSM or KMS.
Nomni.Al survived only because
Rahmat possesses high integrity.
§10 — Claims Verdict
Matrix
Claim Rahmat's Nor
argument defi
Notice Mon21Apr— Not
period Mon28Apr=5 7a
shortfall workingdays. day
PP 35/2021 adv
Pasal 37(4) writ
mandates con
minimum 7
working days.
Referral 50+ Vol
commissions candidates wor
processedin out:
Nomni's des
official hiring nov
DB. Variable inst
compensation
cannotbe
forfeited after
workis
completed
(KUH Perdata
1365).
Pre-contract Plincident Pers
work reports initi:
delivered and no
added to emt
corporate rela
systems exis
before April] =
de facto
employment
relationship.
CEO verbal “3 years at Info
assurance Liven =10 stat
years non
elsewhere" binc
caused
Rahmat to
decline
competing
offers =
detrimental
reliance.
§10.3 — Nomni's Four
Legal Fallacies
1. Shadow category fallacy. "it's not PHK
—it'sjust probation ending. "Every
PKWTT termination, including during
probation, is classified as a PHK under
Indonesian law. Manufacturing anon-
existent employment category is nota
defense; itis evidence of legal
incompetence.
2. False equivalence. “Referral work is
like cleaning someone's car for free."
Nomni operates a structured referral
system, actively processed 50+
candidates, and gained measurable
hiring database assets. This cannot be
retroactively reclassifed as a volunteer
favor.
3. Onboarding deniability. "Pre-
contract work was personal initiative."
Adding Rahmat to corporate
infrastructure, Slack, and internal
systems before April lis a de facto
onboarding action that creates
enforceable obligations regardless of
the nominal contract start date.
4. Defamation scarecrow. "We're being
merciful by not fling a UUITE report.”
Filing bipartite claims and sharing factual
records of a labor dispute is a protected
constitutional right. Attempting to
suppress a civillabor claim with criminal
law threats is a textbook sign of legal
desperation and bad-faith negotiation.
§18 — Settlement
Demand &
Recommendations
Settlement demand: IDR 142.5M - 169M
Immediate (1-30 days): PT Nomnie
Technologies Indonesia must settle at
Disnakertrans to prevent public PHI
filing. All UU ITE defamation threats
must cease immediately.
Structural (30-90 days): Replace
non-lawyer GM/HRBP representation
with alicensed Advokat for tripartite
mediation. Reconstruct HR policies to
fully align with PP 35/2021.
Architectural (90+ days): Transition
from manualinfrastructure to fully
declarative laC. Implement mTLS,
ZINA, and KMS — adopting the exact
principles proven by Infraloka
§19 — Risk Matrix
80% — High: PH litigation
escalation. Signed Berita Acara
confirms public deadlockin
Disnakertrans records, making the
case immediately eligible for
Pengadilan Hubungan Industrial fling.
Remedy: settle PP 35/2021 shortfall +
referral commissions.
75% — High: Venture capital brand
damage. Misconduct exposure
directly to Living Lab Ventures,
Carbide Ventures, Artesian, Alium
Capital, and Cherubic Ventures
Impact rated severe. Crunchbase
Heat Score already declining.
Low probability — Critical impact:
Insider security incident. Hostile
offboarding of adeep-access
DevOps architect with nomTLS, HSM,
or KMS controls. Impact rated critical
Only Rahmat's personal integrity
prevents a worst-case scenario.
§20 — Risk Register
Risk — Description Class Rem
ID
ol Notice PO Retre
shortfall — salar
PP 35/2021 com|
Pasal 37(4) for2
work
02 Forfeited Pl Settl
referral IDR
commissions 100,
—KUH
Perdata 1365
03 -UUPDP Pl Imple
2022 mIL¢
violation — dedir
nomIL$/ KMS
tenant- imme
scoped
caching
§22 — Panel Final
Verdict
PT Nomnie Technologies Indonesia has
acted in clear violation of both
Indonesian statutory labor law (PP
35/2021) and civil contract principles
(KUH Perdata Articles 1338 and 1365).
Rahmat Wibowo — a single Senior
DevOps Engineer who singlehandedly
built Infraloka, an enterprise-grade
cloud-native platform — was wrongfully
discarded by a 219-person, venture-
backed organization that demonstrably
could not match his engineering output.
The company’s legal defenses rely
entirely on fabricated employment
categories, arithmetic errors in working-
day calculations, and bad-faith criminal
law threats designed to suppress a
legitimate civil labor claim. The AEGIS
panel finds for Rahmat Wibowo on all four
counts, with total damages assessed at
IDR 169,295,408
Generated by AEGIS Module [H] v2.0 —
Academic & C-Suite Level Judicial Audit,
22 June 2026. Source:
RAHMAT_VS_NOMNI_COMPREHENSIVE_AEGIS_REPORT.md.
#AEGIS #RahmatWibowo #infraloka
#NomniAl #PTNomnieTechnologies
#LabourLaw #DisnakertransTangerang
#PP352021 #KUHPerdata
#LegalDispute
#WhistleblowerProtection